•

At its Mérignac recycling site, Péna Métaux wanted an early response to fire even when the site was empty. Vincent Mouilhayrat, the Péna Group’s health, safety and environment coordinator, explains why the distance to the water mains shaped the decision.
Fire risk during sorting
The site trades metals, handles plastics and sorts mixed non-hazardous waste. Material that cannot be recovered through other routes is used to produce fuel. If a load contains an item the site should not receive, an impact during handling can start a fire.
A water supply close to the area at risk
A conversation with his insurer put Vincent in touch with Smartrium. With the mains some distance away, Péna Métaux chose a self-contained installation. A tank housed in a shipping container supplies the water cannon. Two detection arms alert the remote monitoring centre so its operators can respond.
What it means for the on-call team
Feedback from other recyclers helped inform the decision. Vincent also highlights the value of responding early to limit water use and the peace of mind that remote monitoring brings outside working hours.
“It allows us to detect a fire and put it out early, even when there’s no one on site.”
Vincent Mouilhayrat, health, safety and environment coordinator, Péna Group. Translated from French.
At Mérignac, Péna Métaux chose a Fire Rover system with its own water tank to respond to fires even when the recycling site is empty.
Rejoignez la communauté SMARTRIUM
Abonnez-vous pour recevoir les dernières innovations et conseils en matière de protection incendie, directement dans votre boîte de réception.
